Using Inspection Plans in PC-DMIS

The following topics describe how to use the functionality added to PC-DMIS to automatically create a part program from your Inspection Plan. To create your part program you need to do the following:

Once you have completed these simple tasks, you can then execute your imported inspection plan as a newly created PC-DMIS part program.

 If you have problems using the Inspection Planner commands inside PC-DMIS, ensure that there is an InsPlan.dll file located in the directory where you installed PC-DMIS.

Inspection Planner Default File (IPD)

You must have an Inspection Planner Default file, or (IPD) to import an Inspection Plan into PC-DMIS. The "Inspection Planner Parameters and Rules" topic provides more information on this file.

 The IP Measure option must be enabled on your portlock to use the Inspection Planner capabilities that are discussed in this section.

More:

Inspection Planner Parameters and Rules

Importing the Inspection Plan

Updating Inspection Plans

Performing the Path Optimization

Dual Arm Path Optimization

Path Optimization Summary

Void Detection

Automatically Inserting Move Commands

Exporting an IP File from PC-DMIS